Study report on improvement in Plant Efficiency, Reliability and Life Extension for Phase I CCPP, LKPL, at Kondapalli, Andhra Pradesh, India

Our Services:
Preparation of study report covering suggestions/ methods:
To improve the plant performance and restore benchmark values
To improve the plant availability and Reliability
Restoration of plant performance and integrity for at least 15 more years
To achieve the above, plan and implement appropriate up gradation, modifications, improvements, replacement of obsolete plant equipment and systems
Technical Data
- Combined cycle plant with 2:2:1 configuration
- Plant rating : 368.144 MW
- Gas Turbines : GE Frame 9E Model with inlet Evaporative Cooler
- Main Fuel : Natural gas and back-up fuel is Naphtha
- HRSGs : 3 pressure, Horizontal type, No supplementary firing; Doosan make
- ST: Alstom make
- Water cooled condenser : Hanjung/Doosan