Owner’s Engineer Services for Raw Water Intake System for 4 x 300 MW TPP at Raigarh, Chattisgarh, India
Our Services: Basic engineering, Preparation of Technical Specification, Identification of route for intake pipeline over a distance of 44 Kms and Vendor Engineering review for raw water intake system from Mahanadi river up to the power plant. The raw water pumping flow rate is 4800Cu.M/Hr through 1100MM diameter GRP pipeline.Zero liquid discharge plant envisaged for the plant would optimise the raw water intake for the plant.