Owner’s engineer services for External material Handling Plant from Krishnapattinam Port to Thermal Power Plant using a single flight pipe conveyor (4000TPH- 7.2 Km long)

Owner’s engineer services for External material Handling Plant from Krishnapattinam Port to Thermal Power Plant using a single flight pipe conveyor (4000TPH- 7.2 Km long)

The 4000TPH external material handling plant consisted of transportation from Krishnapatnam port to the 2 x 660MW Thermal Power Plant using a single flight pipe conveyor through a distance of 7.2KM. Plant is commissioned and is in operation since 2016.

Our services

  • Review and approval of EPC contractor’s designs

Client

NCC Power Project Ltd