Owner’s engineer services for External material Handling Plant from Krishnapattinam Port to Thermal Power Plant using a single flight pipe conveyor (4000TPH- 4.8 Km long)

The 4000TPH external material handling plant consisted of transportation from Krishnapatnam port to the 2 x 660MW Thermal Power Plant through a distance of 4.8KM using a single flight pipe conveyor. Plant was commissioned and is in operation since 2014.
Our Services
- Concept finalization and technical planning
- Tendering and EPC contract award
- Review and approval of EPC contractor’s designs