Selected project examples

Feasibility Study for Waste Heat Recovery in 12.5 MW Captive Power Plant, at Ariyalur, Tamil Nadu, India

Feasibility Study for Waste Heat Recovery in 12.5 MW Captive Power Plant, at Ariyalur, Tamil Nadu, India

Preparation of feasibility report for the waste heat recovery from cement plant and utilisation of the heat to increase condensate temperature at captive power plant to improve heat rate.

Our Services

  • Study HMBDs and various options to utilise the waste heat
  • Suitability of existing equipment
  • Preparation of Schematic drawing
  • Implementation of finalised option for heat recovery

Client

UltraTech Cements Limited, Reddipalayam, Ariyalur