Feasibility Study for Performance Improvements in Condenser Cooling System in 12.5 MW Captive Power Plant, at Ariyalur, Tamil Nadu, India

Feasibility Study for Performance Improvements in Condenser Cooling System in 12.5 MW Captive Power Plant, at Ariyalur, Tamil Nadu, India

Our Services: Technical feasibility report for replacing water cooled condenser system with air cooled condenser system

 

Study plant layout for locating air cooled condenser and removal of existing water cooled condenser

Analysing HMBD and identifying the equipment likely to be affected

Suggesting the modifications

Preparation of Overall layout drawing with modifications

Suggesting execution plan and schedule

Client

UltraTech Cements Limited, Reddipalayam, Ariyalur