Neyveli Lignite Corporation Limited (NLC), is developing a new thermal power station of 2 x 500 MW capacity, to replace its ageing 600 MW TPS in Neyveli. Balance of Plant NTA3 package covering raw water treatment and de-mineralization plant of capacity 45.14 MLD, was entrusted to Essar Projects Limited as EPC and to Wipro Enterprises Limited (Wipro Water) was their sub-contractor.

 

Fichtner India carried out the design and detailed engineering of the complete water treatment plant system package including pre-treatment units, de-mineralization plant and softening plant structures to WIPRO, which includes special structure like “W” shaped tube settler of size 30.4 m x 31 m x 6.4 m etc. The job was completed successfully and all the design and drawings were cleared by NLC well in time. The plant is under erection.

Our Services

  • Structural Planning of buildings and technological structures
  • Architectural Planning of buildings
  • Foundation planning of buildings and structures.
  • Review and value addition for process and equipment layouts
  • General services for engineering structures

Client

Neyveli Lignite Corporation