Detailed Engineering for improvement of continuous Water supply for Coimbatore Corporation
The objective of this assignment was to study the existing water supply network system, conducting water audit, demand assessment and redesign the complete network system to supply the 24 x 7 pressurised water supply to the entire city. This assignment also includes the preparation of Detailed Project Report for the construction of Raw Water & Clear water tunnels.
Our Services
- Condition assessment of existing system
- Hydraulic Investigations
- Water Audit
- Preliminary design
- Detailed design & Cost estimation
- Tender documentation
Technical data
- Covers about 106 sq.km area through 1400 km length of distribution network
- Water demand ultimate stage 289 mld
- Service Reservoirs 63 nos.
- Feeder Main about 70km.
- Raw water tunnel – 3940 m
- Clear water tunnel – 800 m