The project focuses on establishing a hybrid power solution that integrates solar generation with a battery energy storage system (BESS) to support round‑the‑clock energy supply at Jamnagar, Gujarat. Designed as a Solar & BESS (4×1.25 MWh) hybrid plant, it combines multiple coupling configurations, including DC‑DC as well as medium- and low‑voltage interfaces, enabling flexible and efficient interaction between the solar plant and storage units. This setup supports improved operational stability, optimizes energy availability, and strengthens the renewable energy infrastructure in the region. Within this framework, Fichtner contributed by reviewing the engineering and providing comprehensive project management consultancy services.
Project Factsheet
Total BESS capacity
Key Facts
