Gujarat Industries Power Company Limited (GIPCL) is developing a large hybrid renewable energy park in the Khavda region of Kutch, combining solar, wind, and battery energy storage into a unified 2,375 MW facility. The project is planned across multiple phases and blocks, supported by essential infrastructure such as internal and external roads, stormwater drainage, a desalination-based water supply system, and a comprehensive power evacuation network. Additional components include street lighting, fencing, telecommunication systems, administrative buildings, and security installations. Alongside infrastructure development, detailed feasibility work for the North and South Blocks assessed hybrid plant configurations and benchmarked project performance against recent tenders. This combination of implementation planning and feasibility assessment forms the foundation for the park’s long-term development. Within this overall framework, Fichtner contributed through project management consultancy and the preparation of a detailed feasibility report.

Total capacity
Key Facts

Hybrid Solar, Wind, and BESS Project at Khavda

  • Project management from design to commissioning
  • Review and study of Detailed Project Report (DPR)
  • Planning and scheduling
  • Tender preparation and evaluation
  • Inspection and expediting of equipment
  • Construction supervision and management
  • Quality assurance and quality control
  • Feasibility report and financial analysis
  • Total capacity: 2,375 MW
  • Hybrid system: Solar, Wind, BESS
  • Phase I capacity: 600 MW
  • Phase II capacity: 600 MW
  • Phase III capacity: 600 MW
  • Phase IV capacity: 575 MW
  • Transmission voltage: 400 kV / 765 kV

Client

Gujarat Industries Power Company Limited (GIPCL)

Gujarat
India