BESS Integration within a Combined Cycle Power Plant

India

Project Factsheet

Gujarat Industries Power Company Limited (GIPCL) is pursuing the integration of a Battery Energy Storage System within its 165 MW Combined Cycle Power Plant in Vadodara, Gujarat. The initiative aims to enhance operational flexibility and support long‑duration energy discharge needs that go beyond what conventional lithium‑ion solutions typically offer. As part of the conceptual evaluation, Redox Flow Battery technology was considered due to its suitability for extended discharge requirements, positioning the project as an important step toward safer and more adaptable storage solutions. The development of a Detailed Project Report (DPR) served as the basis for assessing technical and financial feasibility, with comparative modeling of Li‑ion and Vanadium Redox Flow Battery (VRFB) technologies. Fichtner supported the project by preparing the DPR and conducting the required financial modeling.

BESS capacity
Key Facts

Detailed Project Report for Battery Storage Development

  • Preparation of Detailed Project Report (DPR)
  • Financial modeling for Li-ion
  • Financial modeling for VRFB
  • Technology comparison analysis
  • Assessment of long‑duration discharge needs
  • Integration concept for CCPP facility
  • CCPP capacity: 165 MW
  • BESS power capacity: 20 MW+
  • BESS energy storage capacity: 100 MWh+

Client

Gujarat Industries Power Company Limited (GIPCL)

Gujarat
India