The client is developing a massive gigawatt-scale renewable energy park in Gujarat, positioning it among the world’s most ambitious clean energy developments. A central element of this initiative is a GW-scale Battery Energy Storage System (BESS), making it one of the largest BESS installations in India and globally. The system supports integrated solar and wind generation to enable round-the-clock power supply, enhance grid stability, reduce renewable energy curtailment, and ease congestion in the transmission network. The project is distributed across three high-capacity pooling substations to optimize evacuation and reliability. Multiple technology providers supply BESS containers, power conversion systems, and energy management systems, ensuring redundancy and operational flexibility. Challenging site conditions –such as high salinity, strong winds, seismic exposure, and low soil-bearing capacity– have been addressed through robust engineering measures. Fichtner supported the project with comprehensive engineering services from concept to execution.
Project Factsheet
Installed BESS capacity distributed across 3 substations
Key Facts
