The development of the 2.4 GW Hybrid Renewable Energy Park in Gujarat represents a major step toward strengthening India’s clean energy capacity and securing reliable renewable power for the future. Designed as an integrated Solar, Wind, and Battery Energy Storage project, the park aims to demonstrate how large-scale hybrid systems can maximize land efficiency, enhance grid stability, and deliver round-the-clock renewable supply. Its dedicated power evacuation infrastructure, extending up to the CTU grid substation, ensures seamless connection of multiple renewable technologies across four development phases. A detailed master plan and optimized hybrid layout support energy yield, operational efficiency, and participation in emerging FDRE (Firm and Dispatchable Renewable Energy) and RTC (Round-the-Clock) tender frameworks. To enable this ambitious undertaking, Fichtner India has provided comprehensive project management consultancy and engineering support across all project stages.
Project Factsheet
Hybrid renewable energy park capacity
Power evacuation transmission levels
Capacity per development phase (Phases I–IV)
Key Facts