The project focuses on the development of a 10 MWp ground-mounted solar photovoltaic plant in Neyveli Township. The installation strengthens local renewable energy generation and supports the expansion of sustainable infrastructure in the region. Beyond the solar arrays themselves, the project includes a full range of supporting facilities such as internal and external road networks, stormwater drainage, water supply systems, power evacuation infrastructure, street lighting, fencing, telecommunications, administrative buildings, and security structures. These elements combine to create a robust and fully operational solar power plant designed for reliable long-term performance. Fichtner contributed to the project by providing essential engineering and technical assessment services that ensured sound design and technical compliance.
Project Factsheet
Installed capacity
Key Facts
Client
Teras New and Renewable Energy Energies LLP
Mumbai
India
